DIGITAL TRANSFORMATION IN CONSTRUCTION

WE OPTIMISE CONSTRUCTION PROJECTS THROUGH DIGITISATION

We are experts in Construction Project Management, providing a professional consultancy service in construction management through a team that is present throughout the entire process. Our innovation is based on digitalisation, which allows us to optimise every phase of the project, from initial planning to final delivery. We are committed to providing efficient and customised solutions, guaranteeing maximum quality and satisfaction for our clients. With our experience and technological approach, we transform the traditional way of building, making every investment safer and more profitable.

Large projects across asset classes typically take 20 percent longer to finish than scheduled and are up to 80 percent over budget”

TRUTHFUL INFORMATION AND TRANSPARENCY IN PROJECTS

Is it possible to have information on the final predictability of the cost and duration of a project? And all this with total transparency in the construction process.

INGREDIENTS FOR UNCERTAINTY

BENEFITS OF WORKING WITH US

  • Alta precisión en el control de coste y calendario
  • Transparencia en todo el proceso de control
  • Tratamiento de los datos y generación de información casi a tiempo real
  • Fomento y mejora de la comunicación entre las partes implicadas- CDE
  • Compactación del ciclo de vida de la infraestructura
  • Ingeniería de valor. Optimización y sostenibilidad en el diseño

La captura automática de la realidad y el procesado de datos semi-automático hacen que el control sea exhaustivo.

La captura y procesado manual de datos por partes de los jefes de obra o responsables de proyecto es deficiente por:

Falta de tiempo de los implicados.
Falta de fiabilidad de los datos recogidos:

  • Por discrepancias entre proyecto y ejecutado.
  • Dificultad de realizar medidas.
  • Falta de conocimientos de las personas asignadas.
  • Dificultad de control de stock de materiales entregados en obra.
  • Dificultad de medida de rendimientos de mano de obra.

El hecho que todo el proceso esté altamente automatizado hace que sea veraz y por tanto transparente. Esto aporta valor promotor, pero también a las constructoras y a sus subcontratos.

Parametrización adaptada a las necesidades del cliente.

Se captura más datos de las que se haría de manera manual y al mismo tiempo se procesa más rápidamente.

Esto permite detectar desviaciones de coste y calendario con antelación.

Al disponer de una herramienta de uso y consulta en la nube accesible por las personas autorizadas se fomenta la cooperación y se evita la existencia de información disgregada.

La captura automática del proceso constructivo y la actualización del modelo de diseño concluye al final de la obra con un Digital Twin idéntico geométricamente a la construcción. Este estará dotado de información y preparado para su uso por parte de sistemas ‘Building Management Systems’ (BMS) o por parte de ‘Maintenance Management Systems’ (MMS).

Optimización de los sistemas del edificio mediante el uso de simulaciones y otros métodos avanzados.

Optimización del proyecto mediante técnicas de diseño generativo que permiten evaluar infinitud de diseños simultáneamente y a partir de criterios objetivos.

Sostenibilidad como eje transversal en el diseño.

Diseños dirigidos hacia la eficiencia energética, la economía circular y la industrialización.

Automatic reality capture and semi-automatic data processing gives a more reliable project control.

The standard manual data capture and processing performed by construction managers and supervisors is highly inaccurate because:

Lack of time for those involved.
Lack of reliability of the data collected:

  • Construction not matching project.
  • Difficult surveillance tasks
  • Lack of technical knowledge of the people involved.
  • Challenging field stock management.
  • Challenging field workers productivity management.

Using highly automated workflows makes a truthful and transparent construction process. That gives value to all partners involved, being that the owner, construction companies or their subcontractors.

Data recording adjustable for every site and costumer.

Much bigger data recording and quickest data processing when comparing with a manual monitoring.

This enables advanced detection of cost and schedule deviations.

Having a cloud use and consultation tool accessible by authorised persons encourages cooperation and prevents the disintegration of information.

The automatic recording of the whole construction process and the simultaneous 3D model update will deliver a final Digital Twin that exactly matches what has been built. This model will have embedded information usable for Building Management System (BMS) and for Maintenance Management Systems (MMS).

Building’s system optimization using simulations and other advanced methods.

Project optimization using generative design techniques which let us to explore many alternatives simultaneously while using objective criteria and constraints.

Sustainability as a transversal axis in the design.

Designs aimed at energy efficiency, circular economy and industrialisation.

Blog

TECHNOLOGY FOR EFFICIENT SITE CONTROL

Today’s Construction Takeoff consists of a mix of realities and negotiations. The process of listing and measuring the work done in a construction project is usually a combination of measurements taken from lay-outs and on-site measurements an inspection. This complex task is often delegated to site managers who may lack

Read more »